Day 18?

Priming the sheet metal

After 2 days off from bus work we are back at it again. The last 2 days we were taking care of our other yacht. Had to do some cleaning and a sea trial. That was a riot.

Today Marina primed the sheet metal that am arrived a week late. We had 5 sheets of sheet metal cut for the skins for the windows by Z metals. The pieces were delivered today and Marina spent the day spray priming them

While she was doing that, I patched the two exit holes in the roof. I used galvanized 16 gauge sheet metal for those two patches and about 60 button head screws. The seams were sealed with a black gooey substance that was served in a caulk tube. I would like to see the person that can pump that stuff through a caulk gun. It’s Thicker than peanut butter and stickier. So I cut the tube open and applied it with a 5 in 1.

That took the better part of the day. The morning was blessed with the neighbor, the old neighbor and the sheet metal delivery guy asking lots of questions and generally just chit chatting. Lots of people with nothing to do. Ok, back to work

Priming the skins